شعار سبيدواي
Meat Cold Storage Solutions

Meat Cold Rooms That Keep Production Moving

We engineer modular chiller, freezer and blast-freezer rooms for pork, لحم, lamb and poultry processors, cold-chain operators, wholesalers and project contractors.

  • We size systems around product load and pull-down time
  • We design hygienic modular rooms for fast installation
  • We supply export-ready packages with drawings and BOMs
C to +4°ج Fresh meat chilling
−18°C to −25°ج Frozen meat storage
Down to −40°ج Blast freezing projects
100–200 مم بو / PIR panel options
Project-ready supply for professional buyers
Cold Room Builders
Refrigeration Wholesalers
Meat Processors
Cold-Chain Distributors
Choose by process

Choose the Right Meat Cold Room by ProcessNot Volume Alone

The correct system depends on product condition, daily incoming load, entry temperature, target core temperature, وقت المنسدلة, packaging and local ambient conditions.

01 C to +4°ج

Fresh Meat Chiller Room

Keep fresh pork, لحم, lamb and poultry stable before cutting, packing or dispatch.

الأفضل ل: butcheries, processors, distribution hubs
02 −18°C to −25°ج

Frozen Meat Storage Room

Store frozen meat long term while coordinating racking, forklift access and controlled defrost.

الأفضل ل: تجار الجملة, المستوردين, cold-chain warehouses
03 −30°C to −40°ج

Meat Blast Freezer

We size rapid pull-down systems around batch weight, entry temperature, freezing time and target core temperature.

الأفضل ل: slaughterhouses, export plants, high-throughput factories
04 Multi-temperature

Combined Processing Cold Room

We coordinate chiller, الفريزر, ante-room and staging zones in one modular workflow.

الأفضل ل: turnkey contractors and expanding food facilities
Engineering design basis

Room Air Temperature Is Not Product Core Temperature

Room air may reach −18°C while meat at its core remains warmer. We calculate the product heat and include it when we select the refrigeration system.

غرفة °ج ≠ Product Core °ج

Storage Duty and Freezing Duty Require Different Capacity

A frozen storage room maintains meat after the product reaches frozen storage temperature. A blast freezer removes product heat within the time your process allows. If you use storage-room capacity for a freezing process, you may face long pull-down times, unstable temperatures and production delays.

Batch weight Entry temperature Target core temperature Pull-down time target

What We Review Before We Select Equipment

01Room dimensions and insulation
02Meat type, packaging and stacking
03Daily and batch product load
04Door openings and working pattern
05Site ambient and condensing conditions
06الجهد االكهربى, phase and 50/60 Hz supply
Contractors installing an industrial modular meat cold room
Built for site teams Clear packing, drawings and installation guidance
Contractor-friendly supply

A Complete Package Your Installation Team Can Work With

We organize every proposal around design conditions, installation sequence, transport limits and site responsibilities, from the insulated enclosure to refrigeration equipment and controls.

  • We summarize design conditions and equipment selection logic
  • We provide panel, door and equipment placement drawings
  • We match the condensing unit, المبخر, controls and accessories
  • We plan container loading for consolidated project shipment
  • We support installation and commissioning remotely
Select the system architecture

Match the Refrigeration Package to Your Team and Project Scale

Standardized systems simplify resale and installation. Component-based systems provide more flexibility for complex rooms, high product loads, redundancy and future expansion.

Fastest installation

وحدة أحادية الكتلة

A compact factory package simplifies small and medium cold-room installation.

Best buyer
Wholesalers & installers
عمل الموقع
قليل
التوحيد القياسي
عالي
OEM potential
قوي
Maximum flexibility

وحدة التكثيف + المبخر

We match individual components for high-load rooms, complex layouts and future expansion.

Best buyer
Engineering companies
عمل الموقع
عالي
Customization
الحد الأقصى
Expansion
قوي
Engineering risk control

Critical Details That Protect Product, Uptime and Operating Cost

A useful proposal should show how the system responds to real operating conditionsnot only list component brands and room temperature.

01

Product Load & Pull-Down

We check capacity against product entry temperature, batch weight, target core temperature and time target.

02

Hygienic Room Details

We coordinate food-safe surfaces, cleanable joints, الصرف, anti-slip floors and raw-product workflow early.

03

High-Ambient Selection

We select condensing equipment for the project location and design ambient, including hot climates.

04

Power & System Protection

We confirm voltage, مرحلة, تكرار, starting current and protection logic before production.

05

Monitoring & Redundancy

Remote alarms, تسجيل البيانات, multi-compressor staging and N+1 options can reduce product-loss risk.

06

Serviceable Components

Internationally available compressors, controls and service parts simplify long-term local maintenance.

Complete room and supply scope

Define the Enclosure, تبريد, Hygiene and Site Responsibilities

Meat cold storage requires more than insulated panels and a compressor. The proposal should coordinate cleanability, ختم الباب, air distribution, الصرف, حماية الأرضية, controls and installation boundaries.

Typical Supply & Design Options

بو / PIR Panels Food-safe metal skin and project-specific thickness
أبواب الغرف الباردة يتوقف, sliding or traffic-door configurations
وحدات التبريد Monoblock, split or component-based systems
Air Coolers We match air throw and coil duty to the room
Control & Monitoring درجة حرارة, تذويب, alarms and protection logic
Floor & Safety عازلة, anti-slip finish, emergency release and lighting

Optional scope can include racking coordination, ante-room planning, drainage details, pressure-relief valves and remote monitoring interfaces.

Clear before ordering

A Scope Matrix That Reduces Site Disputes

The written quotation and bill of materials confirm each party's final responsibilities.

Standard supply

Speedway Supplies

  • الألواح المعزولة, doors and installation accessories
  • Refrigeration equipment and control panel
  • Main valves, protections and project accessories
  • Layout, packing list and installation guidance
Project options

You Can Add

  • Stainless-steel surfaces and hygienic upgrades
  • المراقبة عن بعد, alarms and data logging
  • Spare-parts package for local maintenance
  • On-site engineer or commissioning support
Normally local

Customer / Contractor Provides

  • Civil foundation, drainage and structural support
  • Main electrical supply and external cabling
  • Local labor, lifting equipment and installation tools
  • Destination permits and approvals
Project workflow

From Design Basis to Commissioning Support

A structured process helps wholesalers quote faster and helps contractors identify technical gaps before the project reaches site.

01

Design Basis

منتج, غرفة, حمولة, core temperature, pull-down and site conditions

02

Engineering Selection

Heat-load review, system architecture and insulation specification

03

Technical Proposal

Design assumptions, layout, BOM, scope, options and schedule

04

Production & Packing

تصنيع, تقتيش, marking and shipment consolidation

05

Commissioning Support

Installation guidance, alarm checks, pull-down review and troubleshooting

Faster technical quotation

Send the Right Details. Get a More Useful Proposal.

Even a simple sketch or room dimension sheet is enough to start. The more operating data you provide, the more accurately we can select the refrigeration package.

Include these eight items

  • Internal length × عرض × ارتفاع
  • Meat type, packaging and storage process
  • Daily and batch incoming quantity
  • Entry and target product core temperature
  • Pull-down or freezing time target
  • Site ambient temperature and location
  • مزود الطاقة: الجهد االكهربى / مرحلة / تكرار
  • Supply and installation scope you need
Buyer questions

Meat Cold Room FAQ

Is room temperature the same as product core temperature?

لا. Room air may reach the set point while meat at its core remains warmer. We include product weight, entry temperature, التعبئة والتغليف, airflow and available pull-down time when we size a system for product cooling or freezing.

What is the difference between frozen storage and blast freezing?

Frozen storage maintains meat after it reaches frozen storage temperature. Blast freezing removes product heat within the time your process allows. We define batch weight, entry temperature, target core temperature, product arrangement and freezing time before we size a blast freezer.

How do you select refrigeration capacity for a meat cold room?

We calculate transmission, product pull-down, door infiltration, الناس, إضاءة, المشجعين, defrost and local ambient conditions. Volume-only rules can support early budgeting, but they cannot support final equipment selection.

Which panel thickness is suitable for frozen meat storage?

Many frozen rooms use 120–150 mm PU or PIR panels, while blast-freezing and high-ambient projects may require thicker insulation. We check room temperature, مناخ, floor construction and energy targets before we confirm panel thickness.

Can you supply the system for our contractor to install?

نعم. We can supply modular panels, أبواب, معدات التبريد, الضوابط, مُكَمِّلات, packing marks and installation guidance. Both parties define responsibility for site piping, الأسلاك, المبردات, lifting, labor and commissioning in the quotation.

Can you provide alarms, remote monitoring and system redundancy?

نعم. We can add temperature data logging, remote alarms, multi-compressor staging, duty/standby control and N+1 redundancy. Tell us how you expect the room to respond during a component failure before we select the system.

Planning a Meat Cold Room That Must Perform Under Real Load?

Share your room dimensions, meat process, daily load, entry temperature and target core temperature. We will recommend an enclosure, refrigeration package and supply scope for your project.

لا تفوت أفضل شريك!

جاهز للعمل معنا?

نحن نقوم بتخصيص منتجات التبريد المتميزة بناءً على فكرتك أو اقتراحك منذ ذلك الحين 2010